Skip to content
live

Roadwork for the week of October 31

Timelines of projects are subject to change; projects will be added if they begin during the week
Road work ahead
(stock photo)

MONDAY, OCTOBER 31

Kitchener

Duke Street West is partially closed from College Street to Young Street until the end of the day. Two-way traffic maintained with flagging operation; expect delays. 

Forest Hill Drive is closed from Westmount Road East to Greenbrook Drive until the end of the day for sewer work. One day closure - local traffic only access via Greenbrook Drive end only. 

Francis Street South is closed from Halls Lane West to Charles Street West until September 30, 2026 for new development construction. 

Halls Lane West is closed from Victoria Street South to Francis Street South until September 30, 2026 for new development construction. Access via Victoria Street end only, one way operations. 

Heins Avenue is closed from Jubilee Drive to Joseph Street for a special event from 1 p.m. to 4 p.m. 

King Street West is closed from Queen Street South to Queen Street North for a film shoot. Intermittent closures with WRPS from 8 a.m. to 11 p.m. 

River Road East is partially closed from Lorraine Avenue to Manchester Road for road resurfacing until Friday, November 18. Westbound closure only; eastbound traffic maintained. 

The intersection of Trailwood Crescent and Rolling Meadows Drive is closed until Wednesday, November 2 for sewer work. Local traffic only. 

 

Waterloo

Columbia Street West is closed from Lester Street to Phillip Street until Wednesday for mobile crane operation and tower crane removal. No through traffic. 

Mayfield Avenue is closed from Harvard Road to Mayfield Crescent between 7 a.m. and 4 p.m. for storm structure and crossing replacement. Road closed at 35 Mayfield Avenue. 

 

Cambridge

Cedar Street is closed from Grand Avenue South to St. Andrews Street between 8 a.m. and 3 p.m. for watermain repair.

The intersection of Franklin Boulevard and Elgin Street North has a lane eduction in effect for GRT work until Tuesday, November 8. Two-way traffic maintained.

The intersection of Hespeler Road and Bishop Street North has a lane reduction in effect until the end of the day for utility work. Two-way traffic maintained. 

The intersection of Hespeler Road and Sheldon Drive has a lane reduction in effect until the end of the day for utility work. Two-way traffic maintained. 

Woolwich

Covered Bridge Drive is closed from Hill Street to Rivers Edge Drive for bridge work until the end of the day. No access. 

 

TUESDAY, NOVEMBER 1

Waterloo 

Dawson Street is closed from Euclid Avenue to Menno Street for site servicing until Friday. Road closed at 102 Dawson Street -no through traffic. 

 

Cambridge

The intersection of Can-Amera Parkway and Franklin Boulevard has a lane reduction in effect for GRT work until Friday, November 11. Two-way traffic maintained. 

 

Wellesley

Herrgott Road is partially closed from Temperance Road to Lawson Line until Wednesday, November 30 for bridge reconstruction work. Two-way traffic maintained with flagging operation; expect delays. 

 

WEDNESDAY, NOVEMBER 2

-no new projects scheduled-

 

THURSDAY, NOVEMBER 3

Waterloo

Mayfield Avenue is closed from Rose Lea Crescent to Renaud Drive for water main valve replacement until Friday. Road closed at 76 Mayfield Avenue; no through traffic.

 

Cambridge

Franklin Boulevard has a lane reduction in effect from Main Street to McLaren Avenue until Friday for utility work. Two-way traffic maintained. 

 

North Dumfries

Trussler Road has a lane reduction in effect from Township Road 14 to Township Road 12 until Friday, November 25 for an engineering study. Two-way traffic maintained with flagging operation. 

 

FRIDAY, NOVEMBER 4

Kitchener

Benton Street is partially closed through Courtland Avenue East until the end of the day. Two-way traffic maintained; expect delays. 

 

SATURDAY, NOVEMBER 5

Wilmot

Bridge Street is partially closed from Front Street to Main Street until the end of the day for a special event. Waterloo Regional Police will be controlling that closure. 

 

SUNDAY, NOVEMBER 6

-no new projects scheduled-





Luke Schulz

About the Author: Luke Schulz

Read more
Rogers Sports & Media
230 The Boardwalk Kitchener, ON, N2N 0B1
© 2006-2022 Rogers Sports & Media. All rights reserved.
push icon
Be the first to read breaking stories. Enable push notifications on your device. Disable anytime.
No thanks