MONDAY, APRIL 17

Kitchener

The intersection of Victoria Street North and Lancaster Street West is partially closed until Wednesday, April 26 for Grand River Transit Work. Two-way traffic maintained; expect delays.

The intersection of Westmount Road West and Westwood Road is partially closed until Friday, April 29 for road reconstruction. Two-way traffic maintained; expect delays.

Becker Street has a lane reduction in effect from Fife Avenue to Krug Street until June 15 for utility work. Two-way traffic maintained.

King Street West is partially closed from Water Street North to Ontario Street North until Tuesday, April 25 for sidewalk repair. Daily closure Monday to Friday between 7 a.m. and 6 p.m. Eastbound traffic closure only – westbound open to traffic.

Lois Street is closed from Frederick Street to Rosemount Drive until June 30 for road reconstruction.

Margaret Avenue is closed from Victoria Street North to Maynard Avenue until June 30 for road reconstruction.

The intersection of Norfolk Crescent and St. Clair Avenue is closed for road resurfacing until May 31. Local traffic only.

Perth Road is closed from Pleasant Avenue to South Drive until May 31 for road resurfacing. Local traffic only.

Rex Drive is closed from Queen’s Boulevard to Glen Road until May 31 for road resurfacing. Local traffic only.

St. Clair Avenue is closed from Glen Road to Stirling Avenue South until May 31 for road resurfacing. Local traffic only.

Courtland Avenue East is partially closed from Overland Drive to Hayward Avenue until Friday, April 28. Two-way traffic maintained; expect delays.

Fairway Road North is partially closed from Morgan Avenue to King Street East until Thursday for utility work. Two-way traffic maintained; expect delays.

 

Waterloo

Weber Street North has a lane reduction in effect from Albert Street to Belcan Place until Friday, April 21 for road reconstruction. Two-way traffic maintained; expect delays.

The intersection of Alexandra Avenue and Avondale Avenue South is closed until Tuesday for water main and fire hydrant replacement. No through traffic.

 

Cambridge

Arthur Fach Drive is partially closed from Garth Massey Drive to Baggs Crescent until Friday, April 28. One lane closed.

Baintree Way has a lane reduction in effect from Can-Amera Parkway to Garth Massey Drive until Friday, April 28.

Clemens Avenue is closed from Bretz Avenue to Scott Road until August 18.

Coulthard Boulevard has a lane reduction in effect from Arthur Fach Drive to Baintree Way until Friday, April 28.

Kent Street has a lane reduction in effect from Mt. Royal Palce to Hillsboro Drive until Friday, April 28.

 

Wilmot

Snyder’s Road East is partially closed from Foundry Street to Coachman’s Lane until Friday, June 2 for road reconstruction. Two-way traffic maintained with flagging operation; expect delays.

 

TUESDAY, APRIL 18

Kitchener

Courtland Avenue East is partially closed from Grenville Avenue to Borden Avenue South until Friday for utility work. Two-way traffic maintained with flagging operation; expect delays.

Ottawa Street South is partially closed from Courtland Avenue East to Lilac Street until Friday for utility work. Two-way traffic maintained with flagging operation; expect delays.

The intersection of Victoria Street South and Arthur Place is partially closed until end of day for utility work. Two-way traffic maintained; expect delays.

 

Waterloo

The intersection of Fischer-Hallman Road North and Gatestone Boulevard has a lane reduction in effect until Tuesday, April 25 for Grand River Transit work. Two-way traffic maintained with flagging operation; expect delays.

 

WEDNESDAY, APRIL 19

Kitchener

Frederick Street is partially closed from Irvin Street to Gordon Avenue until Friday, April 28 for utility work. Two-way traffic maintained with flagging operation; expect delays.

The intersection of Parkside Drive and Northfield Drive West has a lane reduction in effect until Wednesday, April 26 for catchbasin work. Two-way traffic maintained; expect delays.

Victoria Street South is partially closed from Charles Street West to Joseph Street until Friday, April 28 for concrete replacement. Two-way traffic maintained; expect delays.

 

Waterloo

The intersection of University Avenue East and Rim Campus Lane has a lane reduction in effect until Friday, April 28 for Grand River Transit work. Two-way traffic maintained; expect delays.

Bluevale Street North is partially closed from Harvard Place to 311 Bluevale Street North until Thursday at 4 p.m. for water main replacement. Eastbound lane closed on Bluevale Street North from Harvard Place to 311 a Bluevale Road North. Westbound lane open.

Eiwo Court is closed from Dansbury Drive to end of cul-e-sac until Friday, May 5 for curb, sidewalk and road repairs. Local access maintained.

 

THURSDAY, APRIL 20

Kitchener

The intersection of Weber Street East and Scott Street is partially closed until Thursday, April 27 for Grand River Transit work. Two-way traffic maintained; expect delays.

 

Waterloo

Frobisher Drive is closed from Bridge Street to Superior Drive until 4 p.m. for storm water pipe crossing replacement. Road closed on Frobisher Drive by Bridge Street West. No through traffic.

 

FRIDAY, APRIL 21

Wilmot

The intersection of Erb’s Road and Fire Tower Road is partially closed until Monday, April 24 for site servicing. Two-way traffic maintained with flagging operation; expect delays.

 

SATURDAY, APRIL 22

-no new projects scheduled-

 

SUNDAY, APRIL 23

-no new projects scheduled-